Marine Drive Cycling Link

District of North Vancouver, BC

Project Info

The work consisted of building a new asphalt multi-use path along Marine Drive, including realigning and replacing curb and gutter and related concrete tie-ins, relocating/installing catch basins and new leads for drainage, installing cyclist fencing, completing any required asphalt tie-ins, restoring disturbed boulevards (topsoil/hydroseed), and finishing with pavement markings and signage, all supported by traffic management, utility coordination, and required permits.

Scope of Work

  • 300 meter of Multi-Use-Pathway (MUP)
  • Realignment of curb and gutter
  • Storm system upgrades
  • MMA line markings
  • Traffic signage
  • CLIENT
  • CONSULTANTUrban Systems
  • TIMELINEJune - September 2025