This project involved critical maintenance and safety improvements to the Mufford Overpass. Work included concrete repairs to the sidewalk slab and abutment wall, removal and repaving of asphalt at the southeast approach, and the extension of existing safety fencing to enhance pedestrian and vehicle safety. These upgrades were designed to improve the structural integrity of the overpass and enhance safety for both pedestrians and vehicles. The work was completed with minimal disruption and in alignment with all applicable engineering and safety standards.